Realization of temporary moorings and complementary interventions connected thereto, for the protection of Venice and its Lagoon.
In recent months, the Port of Chioggia has been at the centre of a complex operation showcasing Italian engineering excellence.
The two Goliath cranes designed, manufactured, erected, assembled and tested by Cimolai Technology, together with ACCS – Armando Cimolai Centro Servizi, at the Val da Rio port area in Chioggia, have left the port for the
Data Pubblicazione: 4 August 2026



