Strategic project for the development of the accessibility and hinterland connections from the port of Venice to the TEN-T network 2009

 

The project concerned the drafting of the design for a new railway station and related connections to the existing  port and national networks.

The realization is a part of the wider plan for the development of the port transport that includes a new container terminal to serve the traditional traffic and the traffic that will be generated by the onshore terminal.

Period: from 01/06/2010 to 31/12/2011

Project: total budget € 2.512.562

Strategic project for the development of the accessibility and hinterland connections from the port of Venice to the TEN-T network  2009
Strategic project for the development of the accessibility and hinterland connections from the port of Venice to the TEN-T network  2009
Strategic project for the development of the accessibility and hinterland connections from the port of Venice to the TEN-T network  2009