Accessibility and dredging

 

This project consisted of infrastructural works to dredge the West and South Industrial canals to a depth of 10,5 meters in order to improve the nautical accessibility in the port of Venice-Marghera. This allowed  vessels of higher tonnage to access the port facilities and thus to develop maritime and co-modal transport.

Furthermore the project contributed at reducing the environmental pollution of the lagoon by removing the contaminated sediments from the two canals.

Period: from 23/07/2009 to 31/12/2011
Project total budget: € 39.120.000
Link: http://inea.ec.europa.eu/en/ten-t/ten-t_projects/ten-t_projects_by_country/italy/2009-it-00073-e.htm

Accessibility and dredging
Accessibility and dredging
Accessibility and dredging
Accessibility and dredging